Foundry Commerce Campus — Orlando
Orlando, FL · General location shown; exact address is released in the diligence file to eligible investors.

Modern light-industrial campus in a high-growth Orlando corridor, targeted for a phased build-out serving flexible commerce demand.
Start with the key terms here, then use the sections below for financials, intelligence, property details, market context, the business plan, structure, risks and documents.
Financial Summary
One model, one set of numbers.
- Purchase price
- $10,800,000
- Improvement / rehab budget
- $2,600,000
- Other project costs
- $720,000
- Contingency
- $480,000
- Total project basis
- $14,600,000
- Projected exit value
- $19,300,000
- Expected profit
- $4,700,000
- Projected return
- 32.2%
- Projected IRR
- 5.7%
- Investment term
- 60 mo
Model rm-calc-1.0.0 · Assumptions: Projected exit value is a modelled estimate, not a contracted sale price.
Uses of capital
Every slice is the same figure shown in the table above.
- Purchase price74%
- Improvement budget18%
- Other project costs5%
- Contingency3%
Where the exit value goes
Modelled split of projected exit value between recovered basis and profit.
- Project basis recovered$14,600,000
- Projected profit$4,700,000
Downside and upside scenarios
Same model, shocked inputs. Projected IRR under each case — modelled, not guaranteed.
5.7%
Base case
5.0%
Rehab +20%
3.5%
Exit −10%
5.2%
Term +6 mo
Investment intelligence
The reasoning behind the score.
Investment DNA
- Acquisition88
Land basis below recent infill industrial trades.
- Market91
Flexible commerce vacancy remains tight within the Orlando submarket.
- Liquidity86
Strong institutional bid for stabilised industrial.
- Rehab62
Ground-up phasing carries the highest execution variance.
- Legal70
Entitlement path not yet complete.
- Climate71
Wind-load design requirements raise build cost.
- Neighborhood83
Growth-corridor location with limited competing modern sites.
- Financial80
Longer term increases rate-path sensitivity.
- Exit84
Multiple credible institutional exit routes.
- Data Quality64
Pre-diligence; several inputs are modelled.
Scores
85
RealTIRR Score
74
Confidence
RealTIRR Score evaluates the overall quality of an opportunity across acquisition, risk, liquidity, execution, downside protection, market conditions and data confidence. A higher projected return does not automatically produce a higher RealTIRR Score.
Model rm-score-2.4 · scored 2026-08-25
Key strengths
- — Land basis below recent infill industrial trades
- — Submarket vacancy is structurally tight
- — Several credible institutional exit routes
Key risks
- — Entitlement is not yet secured
- — Ground-up construction carries elevated cost variance
- — A 60-month term increases interest-rate exposure
Data gaps
- — Entitlement decision pending
- — Geotechnical survey not commissioned
- — Hard-cost bids not yet received
Property
Condition today, condition planned.






Walkthrough

DEMO footage. Not a recording of this asset.
Layout
Foundry Commerce Campus — Orlando
Schematic · DEMO
Improvement budget
$2,600,000 programmed for the physical works.
Contingency
$480,000 reserved against cost variance.
Programme
60 mo from acquisition to modelled exit.
Location context
The block, not just the building.
Illustrative layers
Planned layers
This diagram is not a live map or market-data product. Exact location and verified third-party context will appear after mapping and licensed data infrastructure is connected.
Market
Submarket data, when it can be verified.
Verified market intelligence coming online
RealTIRR will publish submarket pricing, inventory, transaction speed and rent trends for Orlando, FL after a licensed data feed is connected and verified.
No placeholder market figures are displayed.
Business plan
Where this asset sits in its lifecycle.
Acquired
Current phase
Execution
Renovation
Listed
Under contract
Exited
Distribution complete
What does my investment represent?
Proposed participation terms, stated plainly.
- Total offering size
- $14,000,000
- Total unit supply
- 140,000
- Price per unit
- $100
- Minimum subscription
- $50,000 · 500 units
- Proposed participation per unit
- 0.0007% of total unit supply
- Unit represents
- Subject to final counsel-approved documents, one unit is proposed to reflect a non-voting economic membership interest in the offering SPV, not a direct interest in the real property.
- Economic rights
- Proposed pro-rata participation in net proceeds attributable to the asset after debt service, fees, reserves and SPV expenses. No voting or management rights are proposed.
- Distribution rights
- Under the proposed structure, distributions would occur only if and when declared by the SPV manager. No distribution is promised, scheduled or guaranteed.
- Transfer restrictions
- No secondary market is planned. The proposed terms restrict transfers except by operation of law or with manager consent, subject to applicable securities laws.
- Exit treatment
- The proposed treatment at an asset sale is redemption of units, pro-rata distribution of available net proceeds and cancellation of the units, subject to final documents.
These are the proposed terms for this offering. The structure has not been finalized by counsel, so nothing above creates a legal right, an entitlement to distributions, or an enforceable interest. Final terms will be set out in the executed offering documents.
Structure
Proposed structure at a glance.
Physical asset
Foundry Commerce Campus — Orlando, Orlando, FL
SPV / legal entity
To be formed
Economic interests
Defined by the entity's governing documents
Digital representation
Units recorded per the approved structure
Investors
Eligible, verified participants
Risk disclosure
Projections are modelled estimates and are not guaranteed. Real estate investments may result in the loss of some or all invested capital. Risks include project delays, construction cost overruns, market and interest-rate movements, limited liquidity, regulatory change, and risks specific to this property. There is no secondary market for these interests, and you should be prepared to hold until the project exits.
Read the full risk disclosureData Room
Documents, with clear status.
Eligible investors can review available diligence and official offering documents in the document center. Draft or pending items are labelled and are not presented as final.
Open document center